Construction steps of glass walkway

Date:2021-06-18 09:25:13 Page views:1603 Author:

Construction steps of glass walkway: the construction of a glass walkway will go through 13 processes, including erection, beam opening, reinforcement, anchorage, formwork making, surface reinforcement, concrete casting, formwork removal, guardrail, steel pipe welding, cement, color and anchoring.


In the construction of the boardwalk, it is necessary to consider both the planning of the scenic area and the terrain and landforms to find a reasonable boardwalk route. The construction of glass walkway by workers standing on the scaffold at the edge of the cliff without any safety protection measures is just a step of repairing the plank road.


The holing workers and erecting workers have higher risk factors in the construction of glass walkway. At the construction site, construction workers need to hang themselves on cliffs like Spider Man, and then use a drill to drill a shallow hole on the cliff, and then use a steel chisel to drill a hole more than one meter deep into the rock mass.


The above is the basic procedure of glass walkway construction